repair by clamp replacement using cofferdam on 24 at bolo rivers state

Repair by Clamp Replacement using cofferdam on 24 at Bolo Rivers State

Project ongoing

This project is a controlled maintenance procedure applied to a 24-inch Trans-Niger Pipeline (TNP) section. It is typically performed to restore pipeline integrity following localized wall loss, corrosion, or mechanical damage, without requiring full pipeline replacement or extended shutdown

The operation was designed to restore safe operations of the 24” TNP while minimizing production downtime.